PILLAR — UTILITY SERVICE REQUEST AND RESPONSE WORKSHEET Prepared October 16, 2026. Manual editorial tool; not an issued utility approval, engineering analysis, legal opinion or tested product feature. Use the actual provider's current process and the responsible reviewer's advice. Keep a separate entry for each service, response and named project scenario. Use unknown / not stated / not applicable with a reason; do not leave a blank that could be read as approval, zero demand or zero cost. RECORD Entry ID: Prepared by / date: Service: water / wastewater / other (specify): Provider / responsible reviewing group: Service area or provider responsibility confirmed by / source / date: Property address / jurisdiction: Parcel IDs and parcel source/date: PROPOSAL SENT TO THE PROVIDER Scenario name / version / date: Housing type / proposed unit count / phasing: Plan or exhibit filename / version / date: Connection location proposed or discussed (source / unknown): Demand quantity / units: Demand basis / preparer / source / date (or unknown): Provider-required inputs still missing: Request submitted date / reference (or not submitted): RESPONSE — RETAIN THE ACTUAL FILE File or public URL / issued date / reference number: Document stage (request, acknowledgment, preliminary response, approval, other): Scenario and service the response expressly covers: Relevant clause / page / section for each conclusion: Supported service/capacity conclusion in the provider's words or a faithful summary: Conditions stated in the response: Capacity reserved? yes / no / not stated — source clause: Reservation quantity and units, if stated: Approval/effective date, if stated: Expiry / renewal / milestones, if stated: Responsible person and reminder date for stated term: OPEN WORK — EACH ITEM NEEDS ITS OWN OWNER Question / evidence needed / responsible person / target date / status: 1. 2. 3. Possible prompts, only where relevant: provider/service responsibility; connection location and route; required extensions or other infrastructure; separate reviews; work/cost responsibility; cost estimate scope and exclusions. Keep cost unknown when no scoped estimate exists; do not substitute zero. CHANGE CHECK Revised scenario / date: Changed unit count, phase, layout, connection, demand basis or other input: Applicability question sent to provider / date / reference: Provider response / date / file: Applicability status: confirmed for revision / needs further work / unknown: HANDOFF Decision being considered: What this entry currently supports: Unresolved dependencies and effect on that decision: Next reviewer / next action / date: Files supplied with this entry: FICTIONAL EXAMPLE — NO REAL PROPERTY OR PROVIDER RESPONSE Concept A: 42 homes. Concept B: 56 homes. Both are invented concept counts. Water/A: preliminary response received; later demand submission outstanding; reservation not stated. Keep that response attached to A. Wastewater/A and B: response missing. Water/B: applicability unknown; ask the provider what revised inputs are needed. No flow, capacity, engineering design, cost or approval is calculated here.